GAF Energy GAF Energy

3kva Industry Electric Power System 1Phases 1kva 2kva 6kva 10kva 60kva 208/220/230/240Vac UPS Uninterruptible Power Supplies

Product Description

UPS Supply 3phase UPS 10-800KVA
3phase UPS
Introduction
TM11/RM11 1-10kVA is based on online double conversion technology, which is an ideal power supply solution for small-capacity scenarios and can completely eliminate all kinds of grid problems. It covers the capacity range of 1-10kVA, tower or rack installation.
Scenarios
Small and medium enterprises, branches of large enterprises, bank branch networks, large supermarkets, homes, offices and other AC power supply scenarios.
Features
  • Wide input voltage range
  • Online double conversion technology
  • DSP digital control technology
  • Output power factor 1.0
  • Communications: RS232/USB/Dry contact card/SNMP option
Benefits
  • Wide input voltage range adapt to harsh power grid
  • Friendly man-machine interface, easy to operate
  • Intelligent battery management extend battery life
Specification
Model TM1101H/S
RM1101H/S
TM1102H/S
RM1102H/S
TM1103H/S
RM1103H/S
TM1106H/S
RM1106H
TM1110H/S
RM1110H
Capacity 1kVA 2kVA 3kVA 6kVA 10kVA
Input
Phase L+N+PE
Rated Range 208/220/230/240Vac
Voltage Range 110~300Vac
Frequency Range 50/60Hz
Power Factor ≥0.99
Current THDi ≤4% (100% linear load)
Output
Phase L+N+PE
Rated Voltage 208/220/230/240Vac
Power Factor 1.0
Voltage Regulation ±1%
Frequency Utility Mode ±1%/±2/±4%±5%/±10% of the rated frequency (optional)
Battery Mode (50/60±0.1%)Hz
Crest Factor 3:1
THD ≤3% with linear load, ≤5% with non-linear load
Efficiency 96%
Overload ≤ 110%, to bypass after 30 min; ≤ 130%, to bypass after 10 min; ≤ 150%, to bypass after 30s
Battery
Voltage 48/72Vdc
Transfer Time
Transfer Time Utility to Battery : 0ms; Utility to bypass: 0ms
Protection
Alarm overload, utility abnormal, UPS fault, battery low, etc
Protection short circuit, overload, over temperature, battery low, fan fault low, etc
Communication Interface
Interface Type CAN, RS485, FE/LBS/Parallel card, Relay card, SNMP card (optional)
Environment
Operating Temperature 0℃ ~ 40℃
Storage Temperature -25℃ ~ 55℃
Humidity 0~95% non condensing
Altitude <1500m
Noise level <65dB <68dB <70dB
Physical
Cabinet Dimension (D*W*H) mm 495*235*320 495*235*320
Cabinet Weight (kg) 6.95 14.95 20.45 58 59.50
Standard
Standard Compliance EN62040-1, EN62040-2
Product Overview
UPS Device
UPS Unit Left
UPS Unit Front
UPS Unit Right
Detail Images
Applications
Applications Grid
Packing & Delivery
Packaging Box
Pallet Loading
Model UPS Cabinet Dimension UPS Module Dimension Cabinet GW Module weight GW
ECOplus200-50 970*720*2170MM 620*440*131MM 853KG 35KG
ECOplus300-50 970*720*2170MM 620*440*131MM 448KG 35KG
ECOplus400-50 1300*960*2190MM 620*440*131MM 470KG 35KG
ECOplus500-50 1300*960*2190MM 620*440*131MM 506.5KG 35KG
ECOplus600-50 1300*960*2190MM 620*440*131MM 578KG 35KG
1pcs into master carton on pallet
Company Profile
We are a leading manufacturer of modular UPS and network power. With 20 years’ experience in the power electronics field, we are constantly cooperating with global partners, enabling customers to protect their critical applications and ensuring business continuity. We are a fast-growing UPS and network power provider.
Research & Development
The company dedicates 10% of turnover to R&D, including cooperation with top-ranking universities and institutes, advanced research, patent development, and more. This enables us to maintain a technologically advanced position. All design engineers hold a master’s degree or above in power electronics, with at least 10 years of experience in UPS and power applications.
Quality Control
We implement total quality management, spanning precise personnel allocation, component selection, incoming inspection, production, testing, packaging, and final delivery. The company holds certifications for ISO9001, ISO14001, OHSAS18001, as well as CE (LVD/EMC), TLC certification, and energy-saving certification.
Reception
Reception
Industrial Park
View of Industrial Park
HF Production Line
HF 3 phases production line
Modular Production Line
Modular UPS production line
Test Station 1
100KW Test station 1
Test Station 2
100KW Test Station 2
800KVA Station
800KVA Test station 1
800KW Station
800KW Test Station 2
2000KW Room
2000KW Load Test room
PCBA Soldering
PCBA soldering
Soldering Machine
PCBA soldering machine
Production Line
PCBA production line
Material Management
Advanced Material management
Manufacturing Details
Certifications
Certificates
Exhibitions
Singapore Data Center World
2OCT 2019 SINGAPORE DATA CENTER WORLD
Data Center Solution Exhibition
2020 DATA CENTER SOLUTION EXHIBITION
National Tour Exhibition
2021 IT SOLUTION NATIONAL TOUR EXHIBITION
National Tour Exhibition 2
2021 IT SOLUTION NATIONAL TOUR EXHIBITION
Customer Feedback
Customer Feedback Summary
Feedback Detail 1
Feedback Detail 2
FAQ
Q1: Are you a factory or trading company?

A1: Yes, we are a leading modular UPS products factory with 20 years of experience.

Q2: How about the Shipping Method?

A2: Mainly delivered by sea due to the products' weight and size. If a customer requires, we can also deliver by air.

Q3: How about the delivery date?

A3: In general, the delivery date will be 15-30 working days for normal purchase quantities. For larger orders, please check with us for confirmation.

Q4: How about the label and the logo?

A4: Customizing labels and logos is workable according to your requirements.

Q5: How about the MOQ (Minimum Order Quantity)?

A5: For neutral products, the MOQ is 1 unit. For OEM products, the MOQ is 10 units.

Q6: How can I contact customer service for additional inquiries?

A6: For any other questions, please contact our customer service department for assistance.

Related Products